Exploration


  • Kilbourne Mineralization outcrops within ESM’s active use permit.
    • Currently ~8,250 ft (2,515 m) of strike length within permit
    • Additional ~17,000 ft (5,182 m) of total strike length to the East and South within ESM’s mineral rights
  • Drilling indicates continuity from surface to a depth of ~3,500 ft (~1,067 m)
  • Average thickness of the mineralized upper and lower zones is 75.6 ft (22.9 m)
  • Average grade is 3.0% Cg (graphitic carbon)
  • Trenching commenced in December 2023
    • 265 feet (80.7 m) with 91 samples collected
  • Drilling commenced in December 2023
    • 39 holes completed totaling 11,916 ft (3,632 m)
  • Bulk sample was collected in January 2024
  • Phase I of metallurgical testing was completed in Q1 2024 w/ SGS
  • Phase 2 results expected Q3 of 2024.

  • Trenching results have demonstrated significant surface mineralization
    • KT23-001A 55 ft (16.8 m) at 3.2% Cg
    • KT23-001C 42 ft (12.8 m) at 3.5% Cg
  • Initial 39 holes have returned mineralized intercepts in each, with an average mineralized grade of 3.0% Cg
    • Upper Mineralized Zone averages 57 ft (17.8 m) with an average grade of 3.0% Cg
    • Lower Mineralized Zone averages 29 ft (7.8m) thick with an average grade of 3.0% Cg
  • Preliminary metallurgical testing has produced concentrate purity >95% (a benchmark for battery end use) with favorable recoveries
    • The company has refined the Phase II metallurgical sample based on the results from Phase I of exploration